Mon–Fri: 7 AM–10 PM, Sat–Sun: 8 AM–9 PMoffice@concreteimperial.com

Concrete pool decks in Imperial CA - a deck that sheds water and grips wet feet

Old deck cracked, lifting or slick when wet? We settle grip, heat and drainage first, then pour a deck you can walk barefoot.

Concrete pool deck beneath a black screened enclosure, with a blue swimming pool and a lake beyond.

What should I know before building a concrete pool deck in Imperial?

A concrete pool deck in Imperial is flat concrete we form, pour and finish around your pool, and since it'll be wet and walked barefoot, it has to grip, stay bearable underfoot and send water where it belongs.

Usually you're looking at an old deck that's cracked, lifted at one edge or slick after the first splash, or at a new pool sitting in bare dirt. The price moves with the deck's size, the finish you pick, how much old concrete comes out and what the ground needs before we pour. The schedule mostly depends on that ground work and the weather. I walk the job and put the price in writing, so you're planning with your own number and not a guess.

Why Imperial hires us for pool decks

You get the owner on your job, a deck poured on ground we actually prepared, and straight answers about your yard, even when the answer is more work than you hoped.

  • I see it first

    I come out to look at your deck myself, and I'm on site running the crew the day we pour.

  • In business since 2021

    I learned under a boss who made me tear out anything that was close enough, and I still work to his standard.

  • Prep we won't cut

    I'd rather lose a bid than pour on ground I don't trust, because bad prep is how a cheap job gets expensive.

  • Licensed and insured for your project

    We're licensed and insured, and I'm happy to show you the paperwork when I come out to look at the job.

  • Your satisfaction, guaranteed

    That's our promise, and it starts with a call to (760) 483-7530 or the form on this page.

Concrete pool decks we build and replace

Before you pick a finish, we talk through grip for wet feet and how hot it gets on bare skin, and the rest follows from your ground and your water.

  • New deck around a new pool

    When the pool has just gone in, we dig out and pack the subgrade, the ground the slab sits on, because a deck settles with whatever is under it. If the budget is tight, cut the fancy finish before you cut the base, since a nice top on loose dirt is just an expensive crack waiting for summer.

  • Tearing out a deck that failed

    If your old deck is cracked, lifted or tipping toward the house, we break it out and find out why before we pour again. New concrete on the same problem gets you the same deck, only newer.

  • Deck drains and runoff

    Water has to run away from the house and toward or away from the deck drains as designed, without washing dirt into the pool. We settle that drain layout with you before any forms go up, because fixing slope after the pour takes a jackhammer.

  • Steps and slabs that meet the deck

    Plenty of decks meet concrete steps down to the yard or up to the house, so we form them with the deck and keep the heights matched. If a pool house or cabana is part of the plan, that's slab foundation building, and we lay it out with the deck so water runs off both the same way.

What happens when you call about a pool deck in Imperial?

We plan the deck around your yard, your pool and the weather, and we settle the decisions that are hard to change before anyone mixes concrete.

  1. You get in touch

    Call (760) 483-7530 or use the form, and tell us the deck's rough size, the finish you're leaning toward and any water trouble you've noticed.

  2. I walk the site

    I come out to look at the pool, the ground and where the water runs, and I'll ask more questions than you expect.

  3. Your written estimate

    You get the price in writing. If you go ahead, we sort out what the city or county office wants and get the ground ready.

  4. Pour and walk-through

    We pick a pour time that suits the weather, I run the crew on site, and we walk the finished deck with you before we pack up.

Questions about a step? Call and talk it through.

(760) 483-7530

Pool deck questions we hear

How much does a concrete pool deck cost in Imperial, CA?

Across California, an installed 4-inch concrete slab, labor and materials included, usually runs about $9 to $18 per square foot. That's the going rate statewide, not our price, and where your deck lands depends on its size, the finish, any tear-out and the ground prep. I'll walk your yard and put the number in writing.

Which concrete finish is best around a pool for wet, bare feet?

No single finish wins, because broom, textured, exposed aggregate, coatings and overlays each trade grip for wet feet against how hot the surface gets underfoot. A broom finish, the fine ridges dragged across wet concrete, gives good traction, and very dark finishes can get uncomfortable in sun. Bare feet will tell you fast if you got it wrong.

Will my new concrete pool deck crack?

Some cracking is normal, because concrete shrinks as it dries and moves as it heats and cools. We cut control joints, lines where the slab is weakened on purpose, so cracks follow lines we chose and don't wander across the deck. No layout stops every crack, and anyone promising one that never cracks is selling something other than concrete.

What causes a concrete pool deck to lift or heave?

Expansive soil, clay that swells when it gets wet, is a common cause, and one pool engineering firm calls soaking the ground before the pour the most important step against it. On that kind of site, a soaking stage goes into the plan before any concrete does.

How long does it take to put in a concrete pool deck?

Prep takes up most of the calendar, not the pour. Where the ground gets soaked first, it usually needs a week to ten days before the deck goes in, depending on temperature and humidity. After that, it comes down to the deck's size, the permit and finding a pour time that suits the weather.

How do I take care of a concrete pool deck?

Keep the joints sealed, and keep up the seal between the coping, the cap around the pool's edge, and the deck. Both are ongoing jobs for the owner, because water working into those lines and under the slab is how small problems turn into big ones.

Building concrete pool decks in Imperial

The city's Building and Safety Division issues permits and does site inspections, and its Building Permit Infogram can help show whether a deck at your house needs one. Permit rules depend on the city or county your property sits in, so we check with that office before we start and help you through the paperwork. Applications, payments and status checks go through the city's online portal, and the Community Development Department helps with it at (760) 355-1152.

Heat is what we plan around here, since one mapped valley soil sees 0 to 3 inches of rain a year and an average air temperature of 72 to 75 degrees F. Hot weather can cause trouble for concrete any time of year, though it usually hits in summer, so we don't rush a slab in at midday and leave you with a weak, dusty top. We're based in Imperial and see the same dry heat on decks in El Centro, Brawley and plenty of other cities across the Imperial Valley.

Plan your pool deck with Advanced Imperial Concrete

The earlier we see the yard, the easier it is to get the drains and slope right, so call (760) 483-7530 or send the form.